In this talk we describe an optimization model for the periodic preventive maintenance of the handling equipment at a container terminal. Inspired by the real context of the Gioia Tauro port, we discuss the problem, propose a decomposition in two phases, based on different planning horizons, and focus on the short-term planning problem. Some preliminary numerical results on real instances are presented.

Optimal management of the equipment maintenance at a container terminal

Chiarello A.;MONACO, Maria Flavia;
2015-01-01

Abstract

In this talk we describe an optimization model for the periodic preventive maintenance of the handling equipment at a container terminal. Inspired by the real context of the Gioia Tauro port, we discuss the problem, propose a decomposition in two phases, based on different planning horizons, and focus on the short-term planning problem. Some preliminary numerical results on real instances are presented.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11770/186735
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact