This study presents the results of clear-water tests on the following five combined flow-altering countermeasures against bridge pier scour: (1) submerged vanes and a bed sill, (2) slot and sacrificial piles, (3) a collar and sacrificial piles, (4) a slot and a collar, and (5) a bed sill and a collar. Each countermeasure was designed on the basis of the best configuration recommended in the literature. The results clarify that an improper combination of two countermeasures may be less effective than each individual countermeasure; combinations (1), (2), and (3) do not reduce the scour depth significantly with respect to the single countermeasures; combination (3) increases the scour rate during the first few hours with respect to a single collar; combination (4) may also prevent scour intrusion beneath a collar; and combination (5) in the best configuration reduces the scour depth significantly around the collar with respect to maximum scour depth of the unprotected pier, preventing also the scour hole reaching the pier body.

Combined flow-altering countermeasures against bridge pier scour

GAUDIO, Roberto;CALOMINO, Francesco
2012-01-01

Abstract

This study presents the results of clear-water tests on the following five combined flow-altering countermeasures against bridge pier scour: (1) submerged vanes and a bed sill, (2) slot and sacrificial piles, (3) a collar and sacrificial piles, (4) a slot and a collar, and (5) a bed sill and a collar. Each countermeasure was designed on the basis of the best configuration recommended in the literature. The results clarify that an improper combination of two countermeasures may be less effective than each individual countermeasure; combinations (1), (2), and (3) do not reduce the scour depth significantly with respect to the single countermeasures; combination (3) increases the scour rate during the first few hours with respect to a single collar; combination (4) may also prevent scour intrusion beneath a collar; and combination (5) in the best configuration reduces the scour depth significantly around the collar with respect to maximum scour depth of the unprotected pier, preventing also the scour hole reaching the pier body.
2012
Bridge pier; countermeasure; erosion; flow altering; movable bed; scour
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11770/124121
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 78
  • ???jsp.display-item.citation.isi??? 72
social impact