This paper focuses on the optimal management of container discharge/loading at any given berthing point, within a real maritime terminal. Productivity maximization of expensive resources, as rail-mounted berth cranes, should be matched with the vessel requirement of minimizing waiting times with an adequate rate of service completion. To this practical problem, a queuing network model is proposed. Due to its complexity, discrete-event simulation appears as the most appropriate approach to model solution. To get a systematic representation of real constraints and policies of resource allocation and activity scheduling, an event graph (EG)-based methodology has been exploited in simulator design. Alternative policies issued by the operation manager can be inserted in a suitable panel-like view of the queuing network model and then compared by means of simulation, to evaluate the average measures for all berth cranes, such as throughput and completion time. Numerical experiments for simulator validation against real data are encouraging. Some decisions on both straddle carrier assignment to berth cranes and hold assignment and sequencing upon the same crane could be improved by the proposed manager-friendly simulation tool.

A queuing network model for management of berth crane operations

CANONACO Pietro;LEGATO Pasquale;MAZZA, Rina Mary;MUSMANNO Roberto
2008-01-01

Abstract

This paper focuses on the optimal management of container discharge/loading at any given berthing point, within a real maritime terminal. Productivity maximization of expensive resources, as rail-mounted berth cranes, should be matched with the vessel requirement of minimizing waiting times with an adequate rate of service completion. To this practical problem, a queuing network model is proposed. Due to its complexity, discrete-event simulation appears as the most appropriate approach to model solution. To get a systematic representation of real constraints and policies of resource allocation and activity scheduling, an event graph (EG)-based methodology has been exploited in simulator design. Alternative policies issued by the operation manager can be inserted in a suitable panel-like view of the queuing network model and then compared by means of simulation, to evaluate the average measures for all berth cranes, such as throughput and completion time. Numerical experiments for simulator validation against real data are encouraging. Some decisions on both straddle carrier assignment to berth cranes and hold assignment and sequencing upon the same crane could be improved by the proposed manager-friendly simulation tool.
2008
container terminal logistics; queuing networks; discrete-event simulation; event graph
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11770/154117
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 99
  • ???jsp.display-item.citation.isi??? 77
social impact