Concentrating Solar Power (CSP) plants represent a promising solution for flexible and dispatchable power generation, enabling a significant increase in the share of renewable energy in electricity production. However, an effective grid-integrated CSP solution requires careful assessment of plant design and power dispatching to maximize operators' profits while adhering to local regulations. This study introduces a novel methodology for designing and selecting the operational scenarios of a CSP plant to maximize the operator's profits within a national market framework. A case study of a multi-tower CSP system integrated within a Renewable Energy Community (REC) was considered, using real energy demand data and assuming Italian electricity prices and regulations. A numerical model was implemented to assess the CSP plant's performance, and a detailed cost analysis was conducted. The Levelized Cost of Electricity (LCOE) was calculated for fifty-six plant layouts, and the configuration with the lowest LCOE was selected to determine the plant arrangement needed to meet the REC members' power demand of 1 MWe. Fifteen dispatching scenarios were designed, considering tertiary regulation ancillary services, demand following, and simple energy supply. The profit for each scenario was then evaluated, and a comparative analysis was conducted. The results, following the outlined methodology, indicate that the lowest LCOE is 12.42 c€ kWh−1, and that three single-unit CSP plants are required to power the REC members. The multi-tower CSP system enables the plant operator to achieve the highest annual profit of 430 k€ by exclusively providing ancillary services to the electric grid during the evening hours.

Assessment of dispatching scenarios for a multi-tower concentrating solar power plant in a Renewable Energy Community

Rovense, Francesco;Pinnarelli, Anna;Brusco, Giovanni;Vizza, Pasquale;Menniti, Daniele;Sorrentino, Nicola;
2025-01-01

Abstract

Concentrating Solar Power (CSP) plants represent a promising solution for flexible and dispatchable power generation, enabling a significant increase in the share of renewable energy in electricity production. However, an effective grid-integrated CSP solution requires careful assessment of plant design and power dispatching to maximize operators' profits while adhering to local regulations. This study introduces a novel methodology for designing and selecting the operational scenarios of a CSP plant to maximize the operator's profits within a national market framework. A case study of a multi-tower CSP system integrated within a Renewable Energy Community (REC) was considered, using real energy demand data and assuming Italian electricity prices and regulations. A numerical model was implemented to assess the CSP plant's performance, and a detailed cost analysis was conducted. The Levelized Cost of Electricity (LCOE) was calculated for fifty-six plant layouts, and the configuration with the lowest LCOE was selected to determine the plant arrangement needed to meet the REC members' power demand of 1 MWe. Fifteen dispatching scenarios were designed, considering tertiary regulation ancillary services, demand following, and simple energy supply. The profit for each scenario was then evaluated, and a comparative analysis was conducted. The results, following the outlined methodology, indicate that the lowest LCOE is 12.42 c€ kWh−1, and that three single-unit CSP plants are required to power the REC members. The multi-tower CSP system enables the plant operator to achieve the highest annual profit of 430 k€ by exclusively providing ancillary services to the electric grid during the evening hours.
2025
Ancillary services, renewable energy community
Concentrating solar tower
Dispatching scenario
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11770/392132
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 3
social impact